12.6 Rules - Specific Standards

​​​​​12.6.1 Te Rapa North Land Release Staging

A staged release of land for industrial development shall occur in accordance with the provision of appropriate infrastructure (including roading) and developed in accordance with an approved Concept Development Consent ​according to the following land releases occurring:

​a) The release of land for industrial purposes shall be restricted to that which is provided for in Stages 1A and 1B and the Te Rapa Dairy Manufacturing Site​. The subdivision and development of land shall be restricted until further planning tools, such as structure planning, are implemented in the Deferred Industrial Area.
b)​ Land release shall be equally divided between Stages 1A and 1B, pre-January 2021 and post-January 2021, subject to a maximum total land release area of 60ha.
cb) Pre-2021 Land Release:

i)  A maximum of 147ha equally divided between of Stage 1A and Stage 1B (being a total of 7ha per stage).

ii) A maximum total of 630ha equally divided between Stages 1A and 1B (being a total of 30ha per stage) inclusive of the 7ha per stage provided for in 12.6.1c)i) above.
dc)​Post-2021 Land Release:

i) A maximum of 2346ha equally divided between of Stages 1A and 1B (being a total of 23ha per stage), in addition to the 7ha per stage provided for in 12.6.1c)i) above.
ed)​ The Te Rapa Dairy Manufacturing Site​​ land area, as identified on the Planning Map is not affected by the land release provisions set out above.​

12.6.2 Ancillary Offices 

​a) Ancillary offic​​e activity shall not occupy more than 10% of the floor space of the principal industrial activity on the site.​